Changmei Tech launches CM-A tram fastening for grooved rails
Changmei Technology is promoting its CM-A Type Tram Fastening for 59R2 and 60R2 grooved-rail tram projects, with field installation, gauge adjustment and electrical insulation built into one system. The company says the design is aimed at new lines, refurbishments and gauge-correction work where track geometry and stray-current control matter.
Why it matters: - Tram projects need fastening systems that handle gauge stability, vibration, insulation and maintenance without forcing a one-size-fits-all design. - CM-A is positioned as a configurable option for 59R2 and 60R2 grooved rails, which broadens its use across new construction, refurbishment and rail replacement work. - The system’s stated insulation resistance above 10⁸ Ω matters for tramway networks where stray-current control is a key engineering concern.
What happened: - Changmei Technology introduced the CM-A Type Tram Fastening for tramway projects using 59R2 or 60R2 grooved rails. - The fastening system is built around a polymer composite baseplate, microporous elastic pad, glass-fiber-reinforced gauge bushings and standard railway-grade metal parts. - The company says CM-A combines gauge stability, vibration control, electrical insulation and field maintainability. - The system is installed on site after the rail is positioned, using standard track-maintenance tools.
The details: - The polymer composite baseplate forms the primary support interface beneath the grooved rail and is designed to resist moisture and corrosion. - The microporous elastic pad provides the resilient layer that absorbs dynamic loads from passing trams. - The baseplate transfers loads into the sleeper or embedded plate, separating elastic support from the steel rail. - CM-A is compatible with 59R2 and 60R2 grooved rail profiles. - The fastening can be specified for new tram lines, existing-line refurbishment, rail replacement and gauge-correction projects. - Standard gauge adjustment is +8/-16 mm. - An optional +12/-20 mm gauge range is available for special track geometry. - Insulation resistance is specified above 10⁸ Ω. - Wear parts such as elastic pads or bushings can be replaced individually without dismantling the full fastener. - The system secures the rail to a concrete sleeper or embedded plate. - The configuration supports project-specific choices on stiffness, gauge-adjustment range, rail profile and pad material.
Between the lines: - CM-A is being framed less as a single product and more as a project-level engineering package. - That matters because tramway fastening performance depends on local track-bed conditions, rail profile and maintenance approach, not just component specs. - Changmei Technology is also tying product selection to engineering services such as site investigation, parameter confirmation, system architecture design, prototype validation and technical documentation. - The company says early-stage work can include site vibration measurements, environmental impact assessments and parameter validation. - The positioning suggests a sales approach aimed at design institutes, contractors and project owners that want pre-procurement verification. - Changmei Technology says it holds CRCC certification across five product categories and more than 10 models, but individual projects still need to match the specific CM-A model to the applicable certificates and technical documents.
What's next: - Project teams can evaluate CM-A against required stiffness, gauge-adjustment range, rail profile and pad option before procurement. - Changmei Technology says technical collaboration can extend to prototype testing, tender documentation and technical specification drafting. - More information is available in the company’s official announcement.
The bottom line: - CM-A is being marketed as a configurable tram fastening system that combines field installation, adjustable geometry and electrical isolation for grooved-rail networks.
Disclaimer: This article was produced by AGP Wire with the assistance of artificial intelligence based on original source content and has been refined to improve clarity, structure, and readability. This content is provided on an “as is” basis. While care has been taken in its preparation, it may contain inaccuracies or omissions, and readers should consult the original source and independently verify key information where appropriate. This content is for informational purposes only and does not constitute legal, financial, investment, or other professional advice.
Sign up for:
Transportation World Online
The daily local news briefing you can trust. Every day. Subscribe now.
Check Your Email!
We sent a one-time activation link to: .
Confirm it's you by clicking the email link.
If the email is not in your inbox, check spam or try again.
Welcome back!
is already signed up. Check your inbox for updates.