AGP Picks
View all

ADDENDUM #1 - Paving and Traffic Stripe for the Realignment of CR-339 at CR-26 - SCP 59-975-25

SCP 59-975-25

ADDENDUM NO. 1

Date: November 4, 2026

RE: Paving and Traffic Stripe for the Realignment of CR-339 at CR-26


Revision:

  1. Wearing Surface Quantity Revision (424A-360)
  • There has been a change in the quantity for pay item 424A-360 (Bituminous Concrete Wearing Surface Layer, ½” Maximum Aggregate Size Mix, ESAL Range C/D) from 670 tons to 850 tons. Attached to this Addendum are a revised Bid Form and Summary of Quantities sheet. Please replace the original Bid Form and Summary of Quantities sheet with the attached revisions.


  1. Pay Item Addition – Patching (424B-655)
    • There has been an addition of 50 tons of 424B-655 (Bituminous Concrete Upper Binder Layer, Patching, 1” Maximum Aggregate Size Mix, ESAL Range C/D) to the project. Please replace the original Bid Form and Summary of Quantities sheet with the attached revisions.


*To view this addendum in it's entirety, please visit https://ebid.shelbyal.com/CurrentBids .


Legal Disclaimer:

EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

Transportation World Online

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.